Electricity summer peak problem in Mid Canterbury
Authors
Date
1983
Type
Monograph
Abstract
This paper attempts to explain the problems of peak load as they have
occured and grown in the Ashburton region. The growth of spray irrigation load in Mid Canterbury
during the past decade has had a marked effect on the
operations of the Ashburton Electric Power Board.
Indications are that the load will continue to grow during
the foreseeable future.
Permalink
Source DOI
Rights
Copyright © The Author.